- Which of the following are parameters involved in computing the total cost of a software development project ?
A. Hardware and software costs
B. Effort costs
C. Travel and training costs
D. All of the mentioned
Explanation: All these are accounted for in estimating a software development cost
IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.
PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.
Q:
Which of the following is not achieved by an automated estimation tools ?
Q:
What is related to the overall functionality of the delivered software ?
Q:
The environment that supports the software project is called_______________________?
Q:
CLSS stands for_____________________?
Q:
A number of independent investigators have developed a team-oriented approach to requirements gathering that can be applied to establish the scope of a project called ?
Q:
A _______________ is developed using historical cost information that relates some software metric to the project cost ?
Q:
Which of the following costs is not part of the total effort cost ?
Q:
Which technique is applicable when other projects in the same analogy application domain have been completed ?
Q:
Which of the following states that work expands to fill the time available ?
Q:
Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools ?
Q:
Which model is used during early stages of the system design after the requirements have been established ?
Q:
Which model assumes that systems are created from reusable components, scripting or database programming ?
Q:
Which one is not a stage of COCOMO-II ?
Q:
Estimation of size for a project is dependent on___________________?
Q:
Which one is not a size measure for software product ?
A. Hardware and software costs
B. Effort costs
C. Travel and training costs
D. All of the mentioned
D. All of the mentioned
Explanation: All these are accounted for in estimating a software development cost
This set of Software Engineering Multiple Choice Questions & Answers (MCQs) focuses on “Size and Cost Estimation of Software”. 1. Which of the following are parameters involved in computing the total cost of a software development project? Answer: d 2. Which of the following costs is not part of the total effort cost? Answer: c 3. What is related to the overall functionality of the delivered software? Answer: a 4. A _________ is developed using historical cost information that relates some software metric to the project cost. Answer: a 5. It is often difficult to estimate size at an early stage in a project when only a specification is available Answer: a 6. Which technique is applicable when other projects in the same analogy application domain have been completed? Answer: c 7. Which model assumes that
systems are created from reusable components, scripting or database programming? Answer: a 8. Which of the following states that work expands to fill the time available. Answer: c 9. Which model is used during early stages of the system design after the requirements have been
established? Answer: d 10. Which model is used to compute the
effort required to integrate reusable components or program code that is automatically generated by design or program translation tools? Answer: c 11. The COCOMO model takes into account different approaches to software development, reuse, etc. Answer: b Sanfoundry Global Education & Learning Series – Software Engineering. Here’s the list of Best Books in
Software Engineering. Next Steps:
a) Hardware and software costs
b) Effort costs
c) Travel and training costs
d) All of the
mentioned
View Answer
Explanation: All these are accounted for in estimating a software development cost.
a) Costs of networking and communications
b) Costs of providing heating and lighting office space
c) Costs of lunch time food
d) Costs of support staff
View Answer
Explanation: This is a incurred by the employees.
a) Function-related metrics
b) Product-related metrics
c) Size-related metrics
d) None of the mentioned
View Answer
Explanation: Productivity is expressed in terms
of the amount of useful functionality produced in some given time. Function points and object points
are the best-known metrics of this type.
a) Algorithmic cost modelling
b) Expert judgement
c) Estimation by analogy
d) Parkinson’s Law
View Answer
Explanation: The
model uses a basic regression formula with parameters that are derived from historical project data and current as well as future project characteristics.
a) True
b) False
View Answer
Explanation: Function-point and object-point estimates are easier to produce than estimates of code
size but are often still inaccurate.
a) Algorithmic cost modelling
b) Expert judgement
c) Estimation by analogy
d) Parkinson’s Law
View Answer
Explanation: The cost of a new project is estimated by analogy with these completed projects.
a) An application-composition model
b) A post-architecture model
c) A reuse model
d) An early design model
View Answer
Explanation: It is designed to make estimates of prototype development.
a) CASE tools
b) Pricing to
win
c) Parkinson’s Law
d) Expert judgement
View Answer
Explanation: The cost is determined by available resources rather than by objective assessment. If the software has to be delivered in 12 months and 5 people are available, the effort required is estimated to be 60 person-months.
a) An application-composition model
b) A post-architecture model
c) A reuse model
d) An early design model
View Answer
Explanation: Estimates are based on function points, which are then converted to number of lines of source code. The formula follows the standard form discussed above with a simplified set of seven multipliers.
a) An application-composition model
b) A post-architecture model
c) A reuse model
d) An early design model
View Answer
Explanation: None.
a)
True
b) False
View Answer
Explanation: Its the COCOMO-2 model. COCOMO 2 incorporates a range of sub-models that produce increasingly detailed software estimates.
Manish Bhojasia, a technology veteran with 20+ years @ Cisco & Wipro, is Founder and CTO at Sanfoundry. He lives in Bangalore, and focuses on development of Linux Kernel, SAN Technologies, Advanced C, Data Structures & Alogrithms. Stay connected with him at LinkedIn.
Subscribe to his free Masterclasses at Youtube & technical discussions at Telegram SanfoundryClasses.
Which of the following are parameter involved in computing the total cost of software development project?
Which parameters are essential while computing the software development cost?
What is related to the overall functionality of the delivered software Mcq?
Which of the following is not included in the total effort cost?
Q. | Which of the following costs is not part of the total effort cost? |
B. | costs of providing heating and lighting office space |
C. | costs of lunch time food |
D. | costs of support staff |
Answer» c. costs of lunch time food |